Installation Guide

Pipe and Fitting Joint Assembly, Step by Step

1. All components have a male and a female end. The orientation is indicated on the labelling of each section with an arrow. The arrow indicates the direction of the flue.

2. Before fitting the large and small ends into one another, a sealant (LTS or HTS) is applied on the male end, at the gap between the inner flange and the inner pipe.

3. Assemble both sections by sliding one section into the other until the flanges meet. A layer of sealant is applied inside the V-Groove of the Assembly band (AB) prior to it’s installation over the joint.

4. The Assembly Band (AB) is installed and clamped in place with 4 nuts and bolts (supplied).

5. Insert the insulation strip around the inner joint assembly of insulated models IPPL2 and IPPL2F.

6. The Finishing Band (FB) is installed by slipping the edges of the band into the outer pipe edges and clamping them with 3 nuts and bolts (supplied).

7. FOR OUTDOOR INSTALLATION AND BAD WEATHER PROTECTION, AN EXTERIOR SEALANT (ES) IS APPLIED AT THE JOINT BETWEEN THE FINISHING BAND (FB) AND THE OUTER WALL OF THE CHIMNEY.